Project Description: This project included a three sided 6 foot x 24 foot enclosure to provide shelter for some equipment for the wastewater treatment plant located at Fort Meade, Maryland. The customer opted to offload and anchor the enclosure by themselves. Shelters Direct coordinated with the customer regarding the location of the wall penetrations so that there would be no need to cut in the field.